Menu
Your Cart

HDPE Flap Gate

Plumbing/HDPE Flap Gate

Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM5,319.60
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM5,585.58
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM7,207.20
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM7,567.56
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM8,780.20
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM9,219.21
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM11,046.75
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM12,040.60
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM15,315.30
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM16,294.85
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM23,065.90
Application Automatic operating control by hydro force.  To prevent back flow from storm  rain in main river flow into lower land area.  Maintenance free and low head lo..
RM24,432.98
Showing 1 to 12 of 12 (1 Pages)
Click to share this page to your friends & families and start earning. Affiliate