Menu
Your Cart

Pentens Solar Flex T-202 Solar Reflective Ceramic Coating 16KG

Pentens Solar Flex T-202 Solar Reflective Ceramic Coating 16KG

RM541.80
Price in reward points: 216400
  • Brand Pentens
  • Model: PT-SFT-202-16kg
Products Sold: 0
Product Views: 3679
Add to Cart
Click to share this page to your friends & families and start earning. Affiliate

Description 
PENTENS SOLAR FLEX T-202 is a single component, water-based, ready-mixed, acrylic-based, course textured decorative and protective coating finish over prepared concrete, masonry and steel structures. 

 

Features
• Single component, water-based, ready-mixed, acrylic-based, course textured decorative and protective coating finish over prepared concrete, masonry, and steel structures. 

 

Benefits
• Low VOC. 
• Environmentally friendly.
• Excellent adhesion and durability.
• Excellent weather resistance.
• Excellent abrasion resistance.
• Good impact strength.
• Good flexibility.
• Freeze-thaw resistant.

 

Specifications
• Form: Thick Liquid
• Colour: White
• Resin: 100% Acrylic
• Density: 1.50±0.1 kg/litre
• Solid Content: >65% by weight
• Elongation (CNS 3553): >60%
• Tensile Strength (CNS 3553): >12 kgf/cm²
• Tear Strength (CNS 3559 Type B): >10 kgf/cm²
• Adhesive Strength
   - Steel (CNS 5606): >4 kgf/cm2
   - Concrete (CNS 10142) : >40 kgf/cm2
• Thermal Transmission (mean temperature: 30±50°C) (ASTM C518): <0.12 W/m² K
• Solar Reflectance Index (SRI) - at 0.12 W/m² K: 110
• Reflectance (%): 87.5
• Thermal Emittance: 0.84
• Touch Dry: 1 to 2 hours
• Recoat Time: 1 to 2 hours
• Full Cure: 5 days
• Application Temperature: 5°C to 40°C
• Service Temperature: 0°C to 80°C
• Shelf Life: At least 1 year when unopened and undamaged
• Storage Condition: Store in a dry, cool place
• Packaging: 16kg /pail
• Catalogue(PDF)

 

Areas of application include: 
• Prepared concrete. 
• Masonry. 
• Steel structure. 

 

 

Method of Statement
1. Apply T-007 as a primer layer.
2. Open the cover of FLESEAL T-200 and mix thoroughly. (Can add 10% clean water to mix container.)
3. Apply directly to construction surface by using brush, roller or spray method.
4. Apply second layer after 4 hours.
5. Complete.

 

 

Disclaimer 

All product images shown are for illustration purposes only. Actual products may vary in term of size, type, brand, version, colour, and other relevant characteristics.